Projects
 

Projects completed

(A) Bridges & Flyovers
(B) Water Works
(C) Infra, Buildings, and other Temporary works

 

Bridge and Flyovers

No
Project/Client/Consultants Scope of Works Contract Value (RM) Period
         
1 Menggantikan Jambatan No. 532/8 Di Atas Sungai Ibai, Laluan Persekutuan 3, Kuala Terengganu.
Hajadi S.B.
JKR Malaysia

Design and Build Contract
400m long by 24m wide box-girder bridge; 200m constructed by the ‘Balance Cantilever’, 200m by cast-insitu and 600m by 24m approach roads

28.0Million

Oct 95
to
Mar 98
 
         
2

North South central Expressway – Bridge over Express rail Link (ERL) am Dengkil.
Loh & Loh Construction / ELITE
HSSI S.B.

6-lane dual carriageway bridge. Works include the installation of 600mmǾ spun piles and the launching of 29m pre-cast M-beams.

1.4 Million

Dec 96
to
July 97
         
3 North South Central Expressway – Package 2A – Bridge 25 at Ch 12,000.00.
UE Construction / ELITE.
Ranhill Bersekutu.
4-span dual carriageway flyover. Works include installation of 600mmǾ spun piles and launching of M-beams.
1.4 Million

Apr 97
To
Sept 07

         
4 Naiktaraf Jalan Gopeng – Tapah, Laluan Persekutuan 1, Bridge over Sg. Leong & Bridge over Sg. Incap.
Hajadi S.B. / JKR Malaysia

2 nos. of pedestrian RC bridges. Works include; micro-piles, spun piles installation, launching of pre-cast beams and deck works.

1.1 Million

Oct 99
to
Apr 01

         
5 CyberJaya Road C – Bridge,
UE Construction S.B.
Iktisas Inginieurs S.B.
3-span bridge over river. Works include i600mmǾ spun piles, RC structure, launching of M-beams and river bank protection.
2.1 Million
May 00
to
Jan 02
         
6 Kuantan Kerteh Railway Project Package II
MMC / Franky Construction S.B.
MinConsult
4 nos railway river bridges & 4 Nos road over railway bridges.
10.5 Million
Jun 00
to
Sept 01
 
         
7 Eastern Access to KLIA. Bridge and Elevated Structure works (Package 1B-2)
Panzana Enterprise S.B. / JKR Malaysia
Endeavour Consult S.B.
4-span bridge interchange and a 5-span flyover. Works include installation of 600mmǾ spun piles, RC structure, beam launching and deck construction.
8.4 Million
Sept 01
to
Aug 03
 
         
8 Naiktaraf Laluan 1, Jalan Tapah – Gopeng.
Hajadi S.B. / JKR Malaysia
Perunding Faisal, Abraham & Augustine S.B.
3 nos. dual carriage bridges, RC box culverts and RC retaining walls.
5.5 Million
Sept 01
to
Oct 04
         
9 Naiktaraf Laluan 58, Jalan Teluk Intan – Bidor,
Hajadi S.B. / JKR Malaysia
Prima Konsult S.B.
4 nos. bridges, RC box culverts and piled embankment.
7.0 Million
Dec 01
to
Dec 04
         
10 Membina dan Menyiapkan Jalan dari Simpang B15-B11, Daerah Sepang.
Majulia S.B. / JKR Malaysia
Sigmas Jelas Engineering S.B.
24m long x 13.5m wide and 18m long x 13.5m wide RC bridges across Sg. Rasau and Sg. Anak Rasau
1.5 Million
May 03
to
Mar 04
         
11 Memperelokkan Jalan Ipoh - Butterworth, Laluan 1, Daerah Larut Matang & Selama, Taiping, Perak DR
Hajadi S.B. / JKR Malaysia
2 nos. of bridges over rivers. Works include; temporary steel bridge, piling works, coffer dams, beam launching and deck slab
4.1 Million
July 03
to
July 04
 
         
12 Interchange, Toll Plaza & Access Road at Km 419.1 of the North-South Expressway
Franky Construction S.B.
T&T Konsult S.B.
2 nos. of bridges and box culverts. Works include; pile installation, RC structure, beam launching over expressway and deck works.
4.0 Million
July 04
to
Jan 06
 
         
13 Merekabentuk, Membina dan Menyiapkan Projek Jalan Pintas Bandar Muar.
Ranhill Civil S.B.
Elevated U-turn at Jalan Kesang. Cast insitu RC box girder viaduct
2.0 Million
Oct 04
to
Feb 05
         
14 Flyover KTM track at Bandar Mutiara Seberang Perai Selatan.
Bina Goodyear B.
210m long by 10m wide bridge over KTM line including approach roads.
3.0 Million
June 05
To
Aug 06
         
15 Program Menilai / Mengganti / Membaiki Jambatan di Laluan Persekutuan Struktur No. FT 001/623/40 Kuala Kangsar
Idaz S.B.
NRS Associates
Single span bridge 14m long by 21m wide. Work include; installation of 600mmǾ bored piles, T-beams launching and deck works.
1.3 Million
Aug 05
To
Sept 06
         
16 NS Expressway Third Lane Widening Bridge over Sg. Guntong.
Verde Mount Corp.
MinConsult S.B.
Single span bridge. 32m by 7m. Works include; 600mmǾ bored piles, I-beams and RC structure.
0.8 Million
Mar 06
to
Sept 06
         
17 Access Road Connecting to the Interchange at Km 419.1 NS Expressway
Franky Construction S.B.
T&T Consult S.B.
Single span bridge over river, 20.7m by 22.9m wide. Works include launching of 16 nos. of T-beams.
0.7 Million
Nov 06
to
Jan 07
         
18 Construction of Kuala Sawah STP (Phase 2 Package 3)- Bridge over Railway.
Kajima Corp.
MinConsult S.B.
27m long by 10m wide, bridge. Work include; 600mmǾ bored piles, RC structure and beam launching over railway tracks.
1.4 Million
Jan 07
to
May 07
         
19 The Construction and Completion of Structure Works for Duta Ulu Kelang Expressway (DUKE)-Section 3 & 1B
Pembinaan Hamid Abd. Rahman S.B.
HSSI S.B.
i) 45m long by 27m wide bridge; works include casting and stressing of 13 nos of 45m long T-beams
ii) Twin Vehicular box-culverts, 47.2m by 13.5m by 6m high
iii) 2nos of ‘Pedestrian’ bridges
3.8 Million
Mar 07
to
Sept 08
         
20 Project Membina Jambatan Di Atas Sungai Pahang Di Kuala Krau, Termeloh,
Franky Const. / Binaan Desjaya S.B.
JKR Malaysia
490m long by 14.9m wide bridge crossing Sg. Pahang, work include;
i) 330m by balanced cantilever
ii) 160m In-situ box girders
iii) 750mm/1500mm Ǿ bored piles
34.2 Million
Nov 07
To
Dec 09
 
         
21 Design and Build for The Privatization of KL – Kuala Selangor Expressway.
Templer Interchange.
Mudajaya Corp. Berhad.
Endeavor Sdn.Bhd.
Construction of 6nos. of RC ramps including piling, launching of 112 nos of U-12 beams.
15.0 Million Dec 09
To
Jun 11
 
         
22 Interfacing Between LPT2 and Jalan Ibuk. Subcontract for Bridge Structure Work – Bridge at Jalan Ketengah
Construction of 4 spans bridge structure over new LPT2, launching of 28 nos of U12 beams
1.87 Million
May 10
to
Oct 11
         
23 Privatisation of South Klang Valley Expressway – Section 3
The Construction and Completion of Bridge Structure and Associated Works from Abutment A to Pier 15 for Bridge Over Main Access to Pulau Carey & Sg. Langat – BR 15
740m length x 14.2m wide Bridge . Works include:
a) 270m by Balanced Cantilever method
b) 470m by Precast Beam
c) Launching of 84 nos 40m/35m length Post Tensioned T-Beam
15.57 Million
Oct 10
to
Jun 12