No
|
Project/Client/Consultants |
Scope of Works |
Contract Value (RM) |
Period |
|
|
|
|
|
1 |
Menggantikan Jambatan No. 532/8 Di Atas Sungai Ibai, Laluan Persekutuan 3, Kuala Terengganu.
Hajadi S.B.
JKR Malaysia
|
Design and Build Contract
400m long by 24m wide box-girder bridge; 200m constructed by the ‘Balance Cantilever’, 200m by cast-insitu and 600m by 24m approach roads
|
28.0Million
|
Oct 95
to
Mar 98 |
|
 |
|
|
|
|
|
2 |
North South central Expressway – Bridge over Express rail Link (ERL) am Dengkil.
Loh & Loh Construction / ELITE
HSSI S.B.
|
6-lane dual carriageway bridge. Works include the installation of 600mmǾ spun piles and the launching of 29m pre-cast M-beams.
|
1.4 Million
|
Dec 96
to
July 97
|
|
|
|
|
|
3 |
North South Central Expressway – Package 2A – Bridge 25 at Ch 12,000.00.
UE Construction / ELITE.
Ranhill Bersekutu.
|
4-span dual carriageway flyover. Works include installation of 600mmǾ spun piles and launching of M-beams.
|
1.4 Million
|
Apr 97
To
Sept 07
|
|
|
|
|
|
4 |
Naiktaraf Jalan Gopeng – Tapah, Laluan Persekutuan 1, Bridge over Sg. Leong & Bridge over Sg. Incap.
Hajadi S.B. / JKR Malaysia
|
2 nos. of pedestrian RC bridges. Works include; micro-piles, spun piles installation, launching of pre-cast beams and deck works.
|
1.1 Million
|
Oct 99
to
Apr 01
|
|
|
|
|
|
5 |
CyberJaya Road C – Bridge,
UE Construction S.B.
Iktisas Inginieurs S.B.
|
3-span bridge over river. Works include i600mmǾ spun piles, RC structure, launching of M-beams and river bank protection.
|
2.1 Million
|
May 00
to
Jan 02 |
|
|
|
|
|
6 |
Kuantan Kerteh Railway Project Package II
MMC / Franky Construction S.B.
MinConsult
|
4 nos railway river bridges & 4 Nos road over railway bridges.
|
10.5 Million
|
Jun 00
to
Sept 01 |
|
 |
|
|
|
|
|
7 |
Eastern Access to KLIA. Bridge and Elevated Structure works (Package 1B-2)
Panzana Enterprise S.B. / JKR Malaysia
Endeavour Consult S.B.
|
4-span bridge interchange and a 5-span flyover. Works include installation of 600mmǾ spun piles, RC structure, beam launching and deck construction.
|
8.4 Million
|
Sept 01
to
Aug 03
|
|
 |
|
|
|
|
|
8 |
Naiktaraf Laluan 1, Jalan Tapah – Gopeng.
Hajadi S.B. / JKR Malaysia
Perunding Faisal, Abraham & Augustine S.B.
|
3 nos. dual carriage bridges, RC box culverts and RC retaining walls.
|
5.5 Million
|
Sept 01
to
Oct 04 |
|
|
|
|
|
9 |
Naiktaraf Laluan 58, Jalan Teluk Intan – Bidor,
Hajadi S.B. / JKR Malaysia
Prima Konsult S.B.
|
4 nos. bridges, RC box culverts and piled embankment.
|
7.0 Million
|
Dec 01
to
Dec 04
|
|
|
|
|
|
10 |
Membina dan Menyiapkan Jalan dari Simpang B15-B11, Daerah Sepang.
Majulia S.B. / JKR Malaysia
Sigmas Jelas Engineering S.B. |
24m long x 13.5m wide and 18m long x 13.5m wide RC bridges across Sg. Rasau and Sg. Anak Rasau
|
1.5 Million
|
May 03
to
Mar 04 |
|
|
|
|
|
11 |
Memperelokkan Jalan Ipoh - Butterworth, Laluan 1, Daerah Larut Matang & Selama, Taiping, Perak DR
Hajadi S.B. / JKR Malaysia
|
2 nos. of bridges over rivers. Works include; temporary steel bridge, piling works, coffer dams, beam launching and deck slab
|
4.1 Million
|
July 03
to
July 04 |
|
 |
|
|
|
|
|
12 |
Interchange, Toll Plaza & Access Road at Km 419.1 of the North-South Expressway
Franky Construction S.B.
T&T Konsult S.B.
|
2 nos. of bridges and box culverts. Works include; pile installation, RC structure, beam launching over expressway and deck works.
|
4.0 Million
|
July 04
to
Jan 06
|
|
 |
|
|
|
|
|
13 |
Merekabentuk, Membina dan Menyiapkan Projek Jalan Pintas Bandar Muar.
Ranhill Civil S.B.
|
Elevated U-turn at Jalan Kesang. Cast insitu RC box girder viaduct
|
2.0 Million
|
Oct 04
to
Feb 05 |
|
|
|
|
|
14 |
Flyover KTM track at Bandar Mutiara Seberang Perai Selatan.
Bina Goodyear B.
|
210m long by 10m wide bridge over KTM line including approach roads.
|
3.0 Million
|
June 05
To
Aug 06 |
|
|
|
|
|
15 |
Program Menilai / Mengganti / Membaiki Jambatan di Laluan Persekutuan Struktur No. FT 001/623/40 Kuala Kangsar
Idaz S.B.
NRS Associates
|
Single span bridge 14m long by 21m wide. Work include; installation of 600mmǾ bored piles, T-beams launching and deck works.
|
1.3 Million
|
Aug 05
To
Sept 06
|
|
|
|
|
|
16 |
NS Expressway Third Lane Widening Bridge over Sg. Guntong.
Verde Mount Corp.
MinConsult S.B.
|
Single span bridge. 32m by 7m. Works include; 600mmǾ bored piles, I-beams and RC structure.
|
0.8 Million
|
Mar 06
to
Sept 06
|
|
|
|
|
|
17 |
Access Road Connecting to the Interchange at Km 419.1 NS Expressway
Franky Construction S.B.
T&T Consult S.B.
|
Single span bridge over river, 20.7m by 22.9m wide. Works include launching of 16 nos. of T-beams.
|
0.7 Million
|
Nov 06
to
Jan 07
|
|
|
|
|
|
18 |
Construction of Kuala Sawah STP (Phase 2 Package 3)- Bridge over Railway.
Kajima Corp.
MinConsult S.B.
|
27m long by 10m wide, bridge. Work include; 600mmǾ bored piles, RC structure and beam launching over railway tracks.
|
1.4 Million
|
Jan 07
to
May 07 |
|
|
|
|
|
19 |
The Construction and Completion of Structure Works for Duta Ulu Kelang Expressway (DUKE)-Section 3 & 1B
Pembinaan Hamid Abd. Rahman S.B.
HSSI S.B.
|
i) 45m long by 27m wide bridge; works include casting and stressing of 13 nos of 45m long T-beams
ii) Twin Vehicular box-culverts, 47.2m by 13.5m by 6m high
iii) 2nos of ‘Pedestrian’ bridges
|
3.8 Million
|
Mar 07
to
Sept 08
|
|
|
|
|
|
20 |
Project Membina Jambatan Di Atas Sungai Pahang Di Kuala Krau, Termeloh,
Franky Const. / Binaan Desjaya S.B.
JKR Malaysia
|
490m long by 14.9m wide bridge crossing Sg. Pahang, work include;
i) 330m by balanced cantilever
ii) 160m In-situ box girders
iii) 750mm/1500mm Ǿ bored piles
|
34.2 Million
|
Nov 07
To
Dec 09
|
|
 |
|
|
|
|
|
21 |
Design and Build for The Privatization of KL – Kuala Selangor Expressway.
Templer Interchange.
Mudajaya Corp. Berhad.
Endeavor Sdn.Bhd.
|
Construction of 6nos. of RC ramps including piling, launching of 112 nos of U-12 beams.
|
15.0 Million |
Dec 09
To
Jun 11
|
|
 |
|
|
|
|
|
22 |
Interfacing Between LPT2 and Jalan Ibuk. Subcontract for Bridge Structure Work – Bridge at Jalan Ketengah
|
Construction of 4 spans bridge structure over new LPT2, launching of 28 nos of U12 beams
|
1.87 Million
|
May 10
to
Oct 11 |
|
|
|
|
|
23 |
Privatisation of South Klang Valley Expressway – Section 3
The Construction and Completion of Bridge Structure and Associated Works from Abutment A to Pier 15 for Bridge Over Main Access to Pulau Carey & Sg. Langat – BR 15
|
740m length x 14.2m wide Bridge . Works include:
a) 270m by Balanced Cantilever method
b) 470m by Precast Beam
c) Launching of 84 nos 40m/35m length Post Tensioned T-Beam
|
15.57 Million
|
Oct 10
to
Jun 12
|