No
|
Project/Client/Consultants |
Scope of Works |
Contract Value (RM) |
Period |
|
1 |
Projek Pembinaan Pusat Latihan Gabungan Pasukan Tempur (PLGPT) Fasa IV, Kem Syed Sirajuddin, Gemas, Negeri Sembilan Darul Khusus
Panzana Enterprise Sdn. Bhd.
KPS Consultancy
|
740m length x 14.2m wide Bridge. Works include:
a) 270m by Balanced Cantilever method
b) 470m by Precast Beam
c) Launching of 84 nos 40m/35m length Post Tensioned T-Beam
|
12.29 Million
|
Jun 11
to
Aug 12
|
|
|
|
|
|
|
|
2 |
Projek Pembinaan Jalan Pintas Rawang Bagi Mengatasi Kesesakan Lalulintas Di Bandar Rawang Secara ‘Design And Build ‘: Jajaran Alternatif Yang Melalui Taman Warisan Negeri Selangor (Elevated Structure) – Geotechnical Works
Panzana Enterprise Sdn. Bhd.
|
Preliminaries Works, Soil Nailing, Rock Slope Stabilization, Reinforced Soil Wall, RC Retaining Wall, Horizontal Drain and others Associated Works.
|
29.4 Million
|
Jul 12
to
Dec 13
|
|
|
|
|
|
3 |
Projek Construction & Completion Of RC Works Of Cooling Water Pump House & Aeration Basin For Design, Engineering, Procurement, Delivery, Construction And Commissioning Of The Manjung Coal Fired Power Plant At Manjung In Malaysia
Mudajaya Corporation Berhad
|
Construction and Completion of RC Works of Cooling Water Pump House & Aeration Basin.
|
27.3 Million
|
Aug 12
to
Jul 13
|
|
|
|
|
|