Projects
 

Projects completed

(A) Bridges & Flyovers
(B) Water Works
(C) Infra, Buildings, and other Temporary works

 

Infra, Buildings & Other Temporary Works

No
Project/Client/Consultants Scope of Works Contract Value (RM) Period
         
1 Bridge over Sg. Aur at Kelang.
Asah S.B. / Lankhorst Pancabumi


2 nos. Temporary steel staging working platforms in the river for the 100 ton piling rig.


0.4 Million


Apr 97
to
Jun 98
         
2

Perak Hanjoong Simen (PHS) Expansion Project, PL-2 Civil and Building works.
Sato Kogyo Co. Ltd / Perak Hanjoong

Cement plant expansion works – Line 2


26.0 Million
Jun 97
to
May 00

         
3 Putrajaya – Prime Minister Office Masonry Works.
Setia Putrajaya S.B.


Bricklaying and plastering works at Main Block, West Wing.
3.7 Million

Feb 98
to
Nov 00


         
4 Sekolah Kebangsaan DWI Tasik
Hajadi S.B. / Kementerian Pendidikan
Akitek Laras



3 blocks of 4 storey school building. Works include; sludge removal & piling works, canteen, sub-station and external infra structural works.

10.8 Million



Jul 01
to
Jul 03

 
         
5 Stormwater Management & Road Tunnel (SMART) Project Package – D5-5-4
MMCEG-Gamuda JV
Sepakat Setia perunding

208m long MN01/02 and MN03/04 ‘Double Box Reinforced Concrete Structure’


10.6 Million

May 04
to
June 06

 
         
6 Stormwater Management & Road Tunnel (SMART) Project Package – D6-5-16
MMCEG-Gamuda JV
Sepakat Setia perunding

58.2m llong MS01’ Single Box Reinforced Concrete Structure’ and 164.29m length of MS02 ‘U-Section Structure’.
2.7 Million

Dec 04
to
July 05

         
7 Stormwater Management & Road Tunnel (SMART) Project Package – D5-5-19
MMCEG-Gamuda JV
Sepakat Setia perunding


102m long MN01/02 and 203m long MN03/04 ‘Double Box Reinforced Concrete Structure’.

10.2 Million

Oct 05
to
May 06
         
8 Pembinaan Jalan Pintas Rawang (Package 5A- Slope Protection and Stabilization) Panzana Enterprise S.B.
Arup Perunding S.B.

Slope stabilization - ‘Soil Nailing’, guniting works.


2.8 Million

Sep 06
to
Jan 07
         
9 Pembinaan Jalan Pintas Rawang – (Package 6A- Arch Culvert and Drainage)
Panzana Enterprise S.B.
Arup Perunding S.B.

300mm dia. Micro Piling Works and drainage works for Arch Culvert


2.1 Million

Mar 07 to
Dec 07

         
10 Project Membina Jambatan Di Atas Sungai Pahang Di Kuala Krau, Termeloh,
Franky Const. / Binaan Desjaya S.B.
JKR Malaysia

Construction Of 200m long X 6m width temporary access bridges across Sg. Pahang & Sheet pile Cofferdam to facilitate pile cap construction.

34.2 Million

Nov 07
to
Dec 09
 
         
11 Pembinaan Jalan Pintas Rawang
Package 5B- Slope Protection and Stabilization Works.
Panzana Enterprise S.B.
Arup Perunding


Slope stabilization - Soil nailing and guniting works.


10.3 Million

Dec 07
to
Jan 12
         
12 Pembinaan Jalan Pintas Rawang Bagi Mengatasi Kesesakan Lalulintas Di Bandar Rawang Secara ‘Design and Build’
Panzana Enterprise Sdn. Bhd.
Arup Perunding


Package 12 - Reinforced Concrete Retaining Wall – Interchange South 2 LHS
Construction & completion of 6m height RC retaining wall.

1.24 Million
Apr 11
to
Feb 12
 
         
13 Projek Pembinaan Pusat Latihan Gabungan Pasukan Tempur (PLGPT) Fasa IV, Kem Syed Sirajuddin, Gemas, Negeri Sembilan Darul Khusus –
Panzana Enterprise Sdn. Bhd.
KPS Consultancy

River alignment at POP_TD

2.45 Million

Sep 11
to
Jun 12
back to top
@2012 Melima Pembinaan