No
|
Project/Client/Consultants |
Scope of Works |
Contract Value (RM) |
Period |
|
|
|
|
|
1 |
Bridge over Sg. Aur at Kelang.
Asah S.B. / Lankhorst Pancabumi
|
2 nos. Temporary steel staging working platforms in the river for the 100 ton piling rig.
|
0.4 Million
|
Apr 97
to
Jun 98
|
|
|
|
|
|
2 |
Perak Hanjoong Simen (PHS) Expansion Project, PL-2 Civil and Building works.
Sato Kogyo Co. Ltd / Perak Hanjoong
|
Cement plant expansion works – Line 2
|
26.0 Million
|
Jun 97
to
May 00
|
|
|
|
|
|
3 |
Putrajaya – Prime Minister Office Masonry Works.
Setia Putrajaya S.B.
|
Bricklaying and plastering works at Main Block, West Wing.
|
3.7 Million
|
Feb 98
to
Nov 00
|
|
|
|
|
|
4 |
Sekolah Kebangsaan DWI Tasik
Hajadi S.B. / Kementerian Pendidikan
Akitek Laras
|
3 blocks of 4 storey school building. Works include; sludge removal & piling works, canteen, sub-station and external infra structural works.
|
10.8 Million
|
Jul 01
to
Jul 03
|
|
|
|
|
|
|
|
5 |
Stormwater Management & Road Tunnel (SMART) Project Package – D5-5-4
MMCEG-Gamuda JV
Sepakat Setia perunding
|
208m long MN01/02 and MN03/04 ‘Double Box Reinforced Concrete Structure’
|
10.6 Million
|
May 04
to
June 06
|
|
|
|
|
|
|
|
6 |
Stormwater Management & Road Tunnel (SMART) Project Package – D6-5-16
MMCEG-Gamuda JV
Sepakat Setia perunding
|
58.2m llong MS01’ Single Box Reinforced Concrete Structure’ and 164.29m length of MS02 ‘U-Section Structure’.
|
2.7 Million
|
Dec 04
to
July 05
|
|
|
|
|
|
7 |
Stormwater Management & Road Tunnel (SMART) Project Package – D5-5-19
MMCEG-Gamuda JV
Sepakat Setia perunding
|
102m long MN01/02 and 203m long MN03/04 ‘Double Box Reinforced Concrete Structure’.
|
10.2 Million
|
Oct 05
to
May 06
|
|
|
|
|
|
8 |
Pembinaan Jalan Pintas Rawang (Package 5A- Slope Protection and Stabilization) Panzana Enterprise S.B.
Arup Perunding S.B.
|
Slope stabilization - ‘Soil Nailing’, guniting works.
|
2.8 Million
|
Sep 06
to
Jan 07 |
|
|
|
|
|
9 |
Pembinaan Jalan Pintas Rawang – (Package 6A- Arch Culvert and Drainage)
Panzana Enterprise S.B.
Arup Perunding S.B.
|
300mm dia. Micro Piling Works and drainage works for Arch Culvert
|
2.1 Million
|
Mar 07 to
Dec 07
|
|
|
|
|
|
10 |
Project Membina Jambatan Di Atas Sungai Pahang Di Kuala Krau, Termeloh,
Franky Const. / Binaan Desjaya S.B.
JKR Malaysia
|
Construction Of 200m long X 6m width temporary access bridges across Sg. Pahang & Sheet pile Cofferdam to facilitate pile cap construction.
|
34.2 Million
|
Nov 07
to
Dec 09
|
|
|
|
|
|
|
|
11 |
Pembinaan Jalan Pintas Rawang
Package 5B- Slope Protection and Stabilization Works.
Panzana Enterprise S.B.
Arup Perunding
|
Slope stabilization - Soil nailing and guniting works.
|
10.3 Million
|
Dec 07
to
Jan 12
|
|
|
|
|
|
12 |
Pembinaan Jalan Pintas Rawang Bagi Mengatasi Kesesakan Lalulintas Di Bandar Rawang Secara ‘Design and Build’
Panzana Enterprise Sdn. Bhd.
Arup Perunding
|
Package 12 - Reinforced Concrete Retaining Wall – Interchange South 2 LHS
Construction & completion of 6m height RC retaining wall.
|
1.24 Million
|
Apr 11
to
Feb 12
|
|
|
|
|
|
|
|
13 |
Projek Pembinaan Pusat Latihan Gabungan Pasukan Tempur (PLGPT) Fasa IV, Kem Syed Sirajuddin, Gemas, Negeri Sembilan Darul Khusus –
Panzana Enterprise Sdn. Bhd.
KPS Consultancy
|
River alignment at POP_TD
|
2.45 Million
|
Sep 11
to
Jun 12
|