Over the years since Pembinaan Melima’s inception in 1995, the expertise, experience and teamwork of our dedicated management, projects managers, supervisors and technical foremen and operators have enabled PMSB to establish an excellent track record and lay a strong foundation as an innovative construction firm, distinguished for its integrity, quality and teamwork.

The portfolio of major projects successfully completed  by PMSB include:


(A) Bridges

  1. Jambatan Sg Ibai (Balanced cantilever construction 400m long x 24m wide)
  2. Kuantan  - Kertih  Railway Project (8 bridges)
  3. Eastern Access to KLIA (Trumpet Interchange and flyover)
  4. Bukit Tagar Interchange
  5. Jambatan Sg Pahang (balanced cantilever bridge with 160m center span)

Balanced Cantilever Bridge over Sg Pahang at Kuala Krau, Pahang
Balanced Cantilever Bridge over Sg Pahang at Kuala Krau, Pahang


(B) Waterworks

  1. Intakes – Sg. Selangor Phase 2 and Phase 3 (both 200MGD plants)
  2. RC reservoirs (40 MG Matang Pagar , 12 MG Batu Arang, 6 MG Bukit Tunku)
  3. Sg Buloh  2200mm and 2100mm fid water pipelines
  4. Water pipelines of various sizes – 130km long from Tg Karang to Sabak Bernam
  5. Sewerage Treatment Plant  (60,000 PE) at  Sunggala, Port Dickson


(C) Other structures

  1. SMART Tunnel – Double Box RC Structure
  2. Perak Hanjoong  Cement Plant  - 2nd line
  3. Dwi Tasik School

Four Million Gallon RC Reservoir at Ulu Langat
Four Million Gallon RC Reservoir at Ulu Langat.


 