No
|
Project/Client/Consultants |
Scope of Works |
Contract Value (RM) |
Period |
|
|
|
|
|
1 |
Sungai Selangor Water Supply Phase 2 – Stage 1 Matang Pagar Reservoir.
Hazama / Puncak Niaga
SMHB & Ranhill Bersekutu.
|
45MG ‘Reinforced Concrete’ reservoir, including earthworks and pipe laying ,2100mm and 1800mm OD MS pipes.
|
16.5 Million
|
Apr 96
to
Aug 98 |
|
|
|
|
|
|
|
2 |
Sungai Selangor Water Supply Phase 2 – Stage 1 , Intake Plant.
Hazama / Puncak Niaga
SMHB & Ranhill Bersekutu.
|
200MGD Intake Plant, include coffer dam along Sg. Selangor for piling works and construction of pumping station.
|
24.4 Million
|
Apr 96
to
Aug 98
|
|
|
|
|
|
|
|
3 |
Sungai Selangor Water Supply Phase 2 – Stage 1 , Raw Water Pumping Plant – Manifold Pipes.
Chemical aste ManagementS.B. / OTV
SMHB S.B.
|
Installation of 2100mmǾ mild steel Manifold pipes.
|
0.2 Million
|
Apr 97
to
Sep 97
|
|
|
|
|
|
4 |
Sewerage Treatment Plant (STP) at Lot 1722, Bukit Sentosa, Mukim Serandah.
Sam McCoy S.B.
|
45,000 PE STP. Work include; all the necessary earthworks, piling and pipe laying works.
|
1.9 Million
|
Nov 97
to
May 98
|
|
|
|
|
|
5 |
Sungai Selangor Water Supply Phase 2 – Stage 2, Batu Arang Reservoir.
Hazama / Puncak Niaga
SMHB & Ranhill Bersekutu
|
18MG RC reservoir, include excavation of 20,000m3 of hard material, slope protection, pipe laying and ancillary works
|
8.9 Million
|
Apr 98
to
Aug 00
|
|
|
|
|
|
|
|
6 |
Greater Ipoh Water Supply II – Raising and Falling Mains
Metropolitan Utilities Corp.
BW Perunding.
|
Laying of 3.5km 1000mm to 1600mmǾ MS pipes
|
1.2 Million
|
Feb 99
to
July 99
|
|
|
|
|
|
7 |
Batu Estate Water Supply Distribution System KL, Bukit Maxwell Reservoir.
Konbina S.B. / JBAS
SMHB S.B.
|
6MG RC reservoir at Bukit Tunku
|
3.3 Million
|
Jul 99
to
Aug 01
|
|
|
|
|
|
8 |
Sewerage Treatment Plant at Lot 13431 Mukin Ulu Kelang.
Sam McCoy S.B.
Seri Jurutera Perunding.
|
5,000PE STP. Work include; piles installation, RC structure and ancillary works.
|
0.9 Million
|
Nov 9
to
Mar 00 |
|
|
|
|
|
9 |
Sungai Selangor Water Supply Phase 3 (SSP3), Intake and Raw Water Pumping Station
Gamuda Engineering S.B.
SMHB SB
|
200MGD Raw Water Intake, works include cofferdams, intake structure, pumping station, pipe works and ancillary buildings.
|
21.5 Million
|
Feb 01
to
Mar 03
|
|
|
|
|
|
10 |
Cheras High Level Reservoir and Booster Station.
Usahasama Norwest-Bina
SMHB S.B.
|
3MG RC reservoir and booster station. Works include; earthworks, slope stabilization, pipe laying and ancillary works.
|
2.7 Million
|
Jul 01
to
Jul 02
|
|
|
|
|
|
11 |
Sungai Selangor Water Supply Phase 3 (SSS3), Raw Water Pipelines - Stage 1
Gamuda Engineering S.B.
SMHB S.B.
|
Supply and lay of 5.5 km long 2000mmǾ MS pipes and ancillary works.
|
8.8 Million
|
Jul 01
to
Mar 03 |
|
|
|
|
|
12 |
Membaikpulih dan Menaiktaraf Jalan Persekutuan 5, Kapar – Sabak Bernam Water Services.
HCM / Zabima Eng.& Const. S.B.
JKR Malaysia.
|
Supply & lay 130 Km of 200mm to 700mmǾ MS pipes and ancillary works.
|
33.6 Million
|
Oct 01
To
Jun 04
|
|
|
|
|
|
13 |
Transmission Pipe at Bukit Chandang, Batang Kali to Antara Gapi.
Prestasi Asia (M) / PKNS
Kumpulan Jurutera Perunding
|
Supply and lay 6.5km of 700mmǾ MS pipes and ancillary works; include 2 nos of pipe jacking under railway tracks
|
6.0 Million
|
Sept 02
to
Feb 04
|
|
|
|
|
|
14 |
Membaikpulih dan Menaiktaraf Jalan Muar-Melaka-Alor Gajah-Simpang Ampat Water Services.
HCM / Zabima Eng.&Const. S.B.
JKR (Melaka)
|
Supply and lay 14 km of 100mm to 700mmǾ MS pipes and ancillary works
|
4.2 Million
|
Nov 02
to
Mar 04
|
|
|
|
|
|
15 |
2.5MG RC Reservoir.
Desaminium Jaya S.B.
Reka Perunding S.B.
|
2.5MG circular RC Reservoir; work include; earthwork and pipe laying.
|
1.2 Million
|
Jan 03
to
Dec 03
|
|
|
|
|
|
16 |
40,000PE (Module 2) Sewerage Treatment Plant.
Desaminium Jaya S.B.
Erinco SB
|
40,000 PE STP, works include; earthworks, M&E installation and auxillary buildings.
.
|
4.4 Million
|
Feb 03
to
Dec 03
|
|
|
|
|
|
17 |
Sungai Selangor Water Supply Phase 3 (SSS3), Raw Water Pipelines – Stage 1
Gamuda Engineering S.B.
SMHB S.B.
|
Supply and lay 5 km of 2000mmǾ MS pipes and ancillary works.
|
7.5 Million
|
June 03
To
Jan 04
|
|
|
|
|
|
18 |
Cadangan Pembangunan Komplex Loji Rawatan Enapcemar diatas Rezab JBA PT246, Wangsa Maju.
Mewah Kota S.B.
SMHB S.B.
|
Sludge Treatment Plant for water Treatment Plant. Work include; pile installation, RC structures and M&E installation.
|
1.8 Million
|
June 04
To
May 05 |
|
|
|
|
|
19 |
Projek Pembangunan Bekalan Air dalam Daerah Sepang.
Konbina Enterprise S.B.
JK Bersatu S.B.
|
5MG RC reservoir. Work include earthwork, RC structure and ancillary works.
|
4.6 Million
|
Aug 04
To
Nov 05
|
|
|
|
|
|
20 |
Sungai Kinta Water Supply Scheme.
Hajadi S.B.
Angkasa Consulting Services S.B.
|
Laying of 700, 800, 1000 and 1600mmǾ MS pipes (4,500m) and ancillary works.
|
3.8 Million
|
Jun 05
to
Sep 06
|
|
|
|
|
|
|
|
21 |
Kerja Pengalihan Paip Bekalan Air bagi Projek Menaiktaraf Laluan B9/FT015 – Sg. Buloh
Lindang S.B.
Sepakat Setia Perunding S.B.
|
1] 1.6 km long – 1000mm, 2000mm and 2200mmǾ MS pipes.
2] 2 Km long – 200, 250, 400,450 and 600mmǾ MS pipes’ including const. and installation of chambers and valves.
|
17.0 Million |
Jan 05
to
Dec 06
|
|
|
|
|
|
|
|
22 |
The Construction of Sewerage Treatment Plant Project Phase 2 – Package 3 at Sunggala, Port Dickson.
Kajima Corp.
MinConsult. S.B.
|
60,000 Sewerage treatment plant along with piling and other civil works.
|
19.0 Million
|
Aug 06
to
Apr 08
|
|
|
|
|
|
|
|
23 |
Syabas Capex Works programme for Upgrading of Existig Twenty-Six (26) Water Treatment Plants.
Mewah Kota S.B.
|
4MG RC reservoir; works include earthworks, slope stabilization, pipe laying and connection and other infra works.
|
11.0 Million
|
July 07
to
May 08 |
|
|
|
|
|
24 |
Syabas Capex Works Programme for Upgrading of Existing Twenty-Six (26) Water Treatment Plants in Selangor.
Mewah Kota S.B.
|
Refurbishment of RC reservoir; work incl. replacing the roofs and top portions of columns
|
1.8 Million
|
Feb 09
to
Jun 09
|