Projects completed

(A) Bridges & Flyovers
(B) Water Works
(C) Infra, Buildings, and other Temporary works

 

Water Works

No
Project/Client/Consultants Scope of Works Contract Value (RM) Period
         
1 Sungai Selangor Water Supply Phase 2 – Stage 1 Matang Pagar Reservoir.
Hazama / Puncak Niaga
SMHB & Ranhill Bersekutu.


45MG ‘Reinforced Concrete’ reservoir, including earthworks and pipe laying ,2100mm and 1800mm OD MS pipes.


16.5 Million

Apr 96
to
Aug 98
 
         
2

Sungai Selangor Water Supply Phase 2 – Stage 1 , Intake Plant.
Hazama / Puncak Niaga
SMHB & Ranhill Bersekutu.

200MGD Intake Plant, include coffer dam along Sg. Selangor for piling works and construction of pumping station.

24.4 Million

Apr 96
to
Aug 98

 
         
3 Sungai Selangor Water Supply Phase 2 – Stage 1 , Raw Water Pumping Plant – Manifold Pipes.
Chemical aste ManagementS.B. / OTV
SMHB S.B.

Installation of 2100mmǾ mild steel Manifold pipes.

0.2 Million

Apr 97
to
Sep 97


         
4 Sewerage Treatment Plant (STP) at Lot 1722, Bukit Sentosa, Mukim Serandah.
Sam McCoy S.B.


45,000 PE STP. Work include; all the necessary earthworks, piling and pipe laying works.

1.9 Million


Nov 97
to
May 98

         
5 Sungai Selangor Water Supply Phase 2 – Stage 2, Batu Arang Reservoir.
Hazama / Puncak Niaga
SMHB & Ranhill Bersekutu

18MG RC reservoir, include excavation of 20,000m3 of hard material, slope protection, pipe laying and ancillary works

8.9 Million

Apr 98
to
Aug 00
 
         
6 Greater Ipoh Water Supply II – Raising and Falling Mains
Metropolitan Utilities Corp.
BW Perunding.

Laying of 3.5km 1000mm to 1600mmǾ MS pipes

1.2 Million

Feb 99
to
July 99
         
7 Batu Estate Water Supply Distribution System KL, Bukit Maxwell Reservoir.
Konbina S.B. / JBAS
SMHB S.B.

6MG RC reservoir at Bukit Tunku
3.3 Million
Jul 99
to
Aug 01

         
8 Sewerage Treatment Plant at Lot 13431 Mukin Ulu Kelang.
Sam McCoy S.B.
Seri Jurutera Perunding.

5,000PE STP. Work include; piles installation, RC structure and ancillary works.

0.9 Million

Nov 9
to
Mar 00
         
9 Sungai Selangor Water Supply Phase 3 (SSP3), Intake and Raw Water Pumping Station
Gamuda Engineering S.B.
SMHB SB

200MGD Raw Water Intake, works include cofferdams, intake structure, pumping station, pipe works and ancillary buildings.

21.5 Million

Feb 01
to
Mar 03

         
10 Cheras High Level Reservoir and Booster Station.
Usahasama Norwest-Bina
SMHB S.B.

3MG RC reservoir and booster station. Works include; earthworks, slope stabilization, pipe laying and ancillary works.

2.7 Million

Jul 01
to
Jul 02
         
11 Sungai Selangor Water Supply Phase 3 (SSS3), Raw Water Pipelines - Stage 1
Gamuda Engineering S.B.
SMHB S.B.

Supply and lay of 5.5 km long 2000mmǾ MS pipes and ancillary works.

8.8 Million

Jul 01
to
Mar 03
         
12 Membaikpulih dan Menaiktaraf Jalan Persekutuan 5, Kapar – Sabak Bernam Water Services.
HCM / Zabima Eng.& Const. S.B.
JKR Malaysia.

Supply & lay 130 Km of 200mm to 700mmǾ MS pipes and ancillary works.

33.6 Million

Oct 01
To
Jun 04
         
13 Transmission Pipe at Bukit Chandang, Batang Kali to Antara Gapi.
Prestasi Asia (M) / PKNS
Kumpulan Jurutera Perunding

Supply and lay 6.5km of 700mmǾ MS pipes and ancillary works; include 2 nos of pipe jacking under railway tracks


6.0 Million
Sept 02
to
Feb 04
         
14 Membaikpulih dan Menaiktaraf Jalan Muar-Melaka-Alor Gajah-Simpang Ampat Water Services.
HCM / Zabima Eng.&Const. S.B.
JKR (Melaka)

Supply and lay 14 km of 100mm to 700mmǾ MS pipes and ancillary works

4.2 Million

Nov 02
to
Mar 04
         
15 2.5MG RC Reservoir.
Desaminium Jaya S.B.
Reka Perunding S.B.

2.5MG circular RC Reservoir; work include; earthwork and pipe laying.

1.2 Million
Jan 03
to
Dec 03

         
16 40,000PE (Module 2) Sewerage Treatment Plant.
Desaminium Jaya S.B.
Erinco SB

40,000 PE STP, works include; earthworks, M&E installation and auxillary buildings.
.
4.4 Million

Feb 03
to
Dec 03

         
17 Sungai Selangor Water Supply Phase 3 (SSS3), Raw Water Pipelines – Stage 1
Gamuda Engineering S.B.
SMHB S.B.

Supply and lay 5 km of 2000mmǾ MS pipes and ancillary works.

7.5 Million
June 03
To
Jan 04
         
18 Cadangan Pembangunan Komplex Loji Rawatan Enapcemar diatas Rezab JBA PT246, Wangsa Maju.
Mewah Kota S.B.
SMHB S.B.

Sludge Treatment Plant for water Treatment Plant. Work include; pile installation, RC structures and M&E installation.

1.8 Million
June 04
To
May 05
         
19 Projek Pembangunan Bekalan Air dalam Daerah Sepang.
Konbina Enterprise S.B.
JK Bersatu S.B.

5MG RC reservoir. Work include earthwork, RC structure and ancillary works.

4.6 Million

Aug 04
To
Nov 05
         
20 Sungai Kinta Water Supply Scheme.
Hajadi S.B.
Angkasa Consulting Services S.B.


Laying of 700, 800, 1000 and 1600mmǾ MS pipes (4,500m) and ancillary works.

3.8 Million

Jun 05
to
Sep 06

 
         
21 Kerja Pengalihan Paip Bekalan Air bagi Projek Menaiktaraf Laluan B9/FT015 – Sg. Buloh
Lindang S.B.
Sepakat Setia Perunding S.B.
1] 1.6 km long – 1000mm, 2000mm and 2200mmǾ MS pipes.
2] 2 Km long – 200, 250, 400,450 and 600mmǾ MS pipes’ including const. and installation of chambers and valves.

17.0 Million Jan 05
to
Dec 06
 
         
22 The Construction of Sewerage Treatment Plant Project Phase 2 – Package 3 at Sunggala, Port Dickson.
Kajima Corp.
MinConsult. S.B.

60,000 Sewerage treatment plant along with piling and other civil works.

19.0 Million

Aug 06
to
Apr 08
 
         
23 Syabas Capex Works programme for Upgrading of Existig Twenty-Six (26) Water Treatment Plants.
Mewah Kota S.B.
4MG RC reservoir; works include earthworks, slope stabilization, pipe laying and connection and other infra works.
11.0 Million
July 07
to
May 08
         
24 Syabas Capex Works Programme for Upgrading of Existing Twenty-Six (26) Water Treatment Plants in Selangor.
Mewah Kota S.B.
Refurbishment of RC reservoir; work incl. replacing the roofs and top portions of columns
1.8 Million
Feb 09
to
Jun 09